HAUL ROAD DESIGN OPTIMISATION APPROACH FOLLOWING TECHNOLOGICAL CONSTRAINTS IN OPEN-PIT MINING

Danail Terziyski, Dimitar Kaykov

ABSTRACT. Modern mining practices rely to a great extent on the application of numerical methods for establishing design alternatives, leading to significant economic benefits. In the current article mine haul road design and construction are treated as two interconnected problems – 1) selection of a suitable optimisation for haul road design and selection of an optimal pit design solution; 2) selection of a suitable technology for haul road construction. Based on previous research, the main factors which determine haul road design feasibility have been identified. They are used for the purpose of establishing the key performance parameters which define the optimality of a haul road design solution. An optimisation problem is defined, which relies on different design solutions and the alternatives for a feasible ultimate pit design. Solutions of this optimisation problem are expected to maximise the mine’s long-term profit. Furthermore, statistical parameters were obtained providing insight into affirming why a certain design solution is more dominant to others in a more robust way.
Key words: haul road design, haul road construction, open-pit mining

DOI: 10.5281/zenodo.7007086
DOI: https://doi.org/10.58903/c16182123

HAUL ROAD DESIGN OPTIMISATION APPROACH FOLLOWING TECHNOLOGICAL CONSTRAINTS IN OPEN-PIT MINING

1. Akay A. E, Aruga, K., Bettinger, P. , Sessions, J., 2013. Using optimisation techniques in designing forest roads and road networks. Journal of Faculty of Forestry Istanbul University, 15 (1), 49–62.

2. Aleksandrova E. Ikonomicheski podhod pri proektiraneto na rudnitsi. Mezhdunarodna nauchna konferentsia “Predizvikatelstvata pred naukata vav vrazka s chlenstvoto na Bulgaria v ES”, 7 – 8 yuni, 2007, Stara Zagora, Bulgaria (in Bulgarian).

3. Aleksandrova E. 2013. Rakovodstvo za uprazhneniyata po tehnologia pri otkritia dobiv na polezni izkopaemi (tehnologichni shemi na prokarvane na otkriti minni izrabotki), Sofia, 2013 (in Bulgarian).

4. Aleksandrova E., Zlatanov P. Planirane na razshiryavaneto na minnoto proizvodstvo po metoda na dinamichnoto optimirane. Nauchna konferentsia s mezhdunarodno uchastie „Naukata v usloviyata na globalizatsia”, tom ІІІ, chast ІІ, 1-2 oktomvri, 2008, Kardzhali, Bulgaria (in Bulgarian).

5. Anachkov A., Konstantinov G. 1985. Proektirane na otkriti rudnitsi. Tehnika, Sofia (in Bulgarian).

6. Atkinson T., 1992. Design and layout of haul roads, in SME Mining Engineering Handbook, 2nd ed., Society for Mining, Metallurgy, and Exploration, Inc., Littleton, Colorado, USA.

7. Baek J., Cho, Y. 2017. A new method for haul road design in open-pit mines to support efficient truck haulage operations, Applied Sciences, 7(7), 747. https://doi.org/10.3390/app7070747

8. Casal G., Santamarina D., Vázquez-Méndez M. E., 2017. Optimisation of horizontal alignment geometry in road design and reconstruction. Transportation Research Part C, 74, 261–274. https://doi.org/10.1016/j.trc.2016.11.019

9. Douglas D.,  Peucker T., 1973. Algorithms for the reduction of the number of points required to represent a digitized line or its caricature, The Canadian Cartographer, 10, 112–122.  DOI: 10.3138/FM57-6770-U75U-7727

10. Grenon M., Laflamme A. 2011. Inter-ramp and bench design of open-pit mines: the Portage pit case study. Canadian Geotechnical Journal, 48(11), 1601-1615. DOI: 10.1139/t11-062

11. Hays M. R., 1990. “Trucks,” in Surface Mining Handbook, Kennedy, B.A., ed., Society for Mining, Metallurgy, and Exploration, Littleton, CO, 672-691.

12. Heinimann H. R., Stückelberger J. A., Chung W., 2003. Improving automatic grid cell based road route location procedures, in: High tech forest operations for mountainous terrain. ed. K. Stampfer, Austro 2003: Schlaegl, Austria, 1–10.

13. Hustrulid W., Kuchta M., Martin R., 2013. Open pit mine Planning and Design, CRC, UK

14. Kecojevic V., Komljenovic D. 2010. Haul truck fuel consumption and CO2 emission under various engine load conditions. Mining engineering, 62(12), 44-48.

15. Koprev I., Djobov I. 2017, Rakovodstvo po protsesi pri otkritia dobiv na polezni izkopaemi. Avangard Prima, Sofia (in Bulgarian)

16. Koprev I. 2015. Rudnichni patishta. Sofia,  Avangard Prima, Sofia (in Bulgarian)

17. Koprev I. 2016. Tehnologia na dobiva na skalno-oblitsovachni materiali. Avangard Prima, Sofia (in Bulgarian)

18. Latecki L. J., Lakamper R., 1999. Polygon evolution by vertex deletion, in: Scale-space theories in computer vision, eds. Nielsen, M., Johansen P., Olsen, O. F., Weickert, J. Proceedings of International Conference on Scale-Space’99’, LNCS 1682. https://doi.org/10.1007/3-540-48236-9_35

19. Liu D, Pourrahimian Y., 2021. A framework for open-pit mine production scheduling under semi-mobile in-pit crushing and conveying systems with the high-angle conveyor, Mining, 1(1). 59-79. https://doi.org/10.3390/mining1010005

20. Mohutsiwa M., Musingwini C., 2015. Parametric estimation of capital costs for establishing a coal mine: South Africa case study, Journal of the Southern African Institute of Mining and Metallurgy, 115(8), 789-797. http://dx.doi.org/10.17159/2411-9717/2015/V115N8A17 

21. Mondal S., Lucet Y., Hare W. 2015. Optimising horizontal alignment of roads in a specified corridor. Computers & . Operations Research, 64, 130–138. https://doi.org/10.1016/j.cor.2015.05.018

22. Morales N., Nancel-Penard P., Parra A., 2017. An integer linear programming model for optimising open pit ramp design, 38th APCOM proceedings, Session 11, 9-16. Nancel-Penard P., Parra A., Morales M., Díaz C.,

23. Widzyk-Capehart E.,  2019. Value-optimal design of ramps in open pit mining, Archives of Mining Sciences, 64(2), 399-413. DOI: 10.24425/ams.2019.128691

24. Paricheh M., Osanloo M. Determination of the optimum in-pit crusher location in open-pit mining under production and operating cost uncertainties. 16th International Conference on Computer Applications in the Mineral Industries, Istanbul, Turkey. 5-7 October, 2016, CAMI2016-34.

25. Stückelberger J. A., 2008. A weighted-graph optimisation approach for automatic location of forest road networks. ETH Zurich. Doctoral Thesis.

26. Stoev H., Dhobov I., Aleksandrova E., Trapov G., Smilyanov A., 2012. Kriteriy za ekspresna otsenka na dva i poveche konkurentni proekta pri razrabotka na nahodishte v otkritia dobiven podotrasal, Geologiya i mineralni resursi, 6 (in Bulgarian), 30-32.

27. Thompson R., Peroni R., Visser A. T., 2019. Mining haul roads. Theory and practice. CRC Press/Balkema, Leiden.

28. Visvalingam M., Whyatt J. D., 1993. Line generalisation by repeated elimination of points, The Cartographic Journal, 30 (1), 46-51. DOI: 10.1179/000870493786962263

29. Wall K., Danielsson P. E., 1984. A fast sequential method for polygonal approximation of sigitised curves, Computer Vision, Graphics and Image Processing, 28, 220-227.

30. Ji Y., Borrmann A., Wimmer J., Gunthne, W. A. Bidirectional coupling of macroscopic optimization and microscopic simulation of earthwork processes. Proceedings of the CIB W78 2010: 27th International Conference, Cairo, Egypt, 16-18 November.

31. Yarmuch J., Brazil M., Rubinstein H., Thomas, D. A., 2020. Optimum ramp design in open pit mines, Computers & Operations Research, 115, 104739. https://doi.org/10.1016/j.cor.2019.06.013

32. Zhao Z., Saalfeld A. Linear-time sleeve-fitting polyline, In Autocarto 13, ACSM/ASPRS’97 Technical Papers, Seattle, Washington, April 1997, vol. 5, pp. 214–223.

33. Zlatanov P., Aleksandrova E., 2005. Rakovodstvo za kursovo proektirane po Tehnologia na otkritia dobiv. Komlivest-LM, Sofia, (in Bulgarian).